CVCWG Simulations | Completed & Published

The following table summarizes the simulations completed by the CVCWG that have been published on the Earth System Grid (ESG) portal here at NCAR or the core Earth System Grid Federation (ESGF) CMIP5 portal at PCMDI.

These simulations were published within the time period of January 2014 - June 2017. The table will be updated periodically as new runs are completed and published.

Datasets/Simulations

Model Case Name(s) Description Additional Info Month Published
CCSM4 CCSM4/CAM4 FV1 slab ocean model 1% per year CO2 increase simulation, years 51-500 CCSM4/CAM4 FV1 slab ocean model 1% per year CO2 increase simulation, years 51-500 10/2015
CCSM4 f.e11.F2000C5.f09_f09.control.001 f.e11.F2000C5.f09_f09.control.001 data 02/2015
CCSM4 20th century ensemble 30x36 year (1970-2005) Fully-coupled, all components, all time sampling 06/2014
CESM Accelerated Scientific Discovery CESM simulations from the Accelerated Scientific Discovery phase of Yellowstone 02/2015
CESM-WACCM b40.rcp8_5.2deg.wcm.00[4-5] RCP8.5 WACCM, all components, all time sampling
CESM-WACCM Climatology of global aerosol properties Climatology of global aerosol properties calculated based on new volcanic emissions database combined with other non-volcanic emissions of sulfur sources. For more information, contact Mike Mills, NCAR ACOM, mmills@ucar.edu. DOI 10.5065/D6S180JM 01/2016
CESM-WACCM b40.rcp2_6.2deg.wcm.00[2-4] RCP2.6 WACCM, all components, all time sampling 02/2014
CESM1 CESM1 Last Millennium Ensemble Project CESM1 Last Millennium Ensemble Project See Last Millennium Ensemble Project web page. 02/2015
CESM1-CAM5 b.e10.B20ANTHROC5CN.f09_g16.00(1,2,4) 20C (1850-2005) anthropogenic-only forcings all components 07/2014
CESM1-CAM5-BGC Large ensemble Large Ensemble (Click through for member information) Updated 2/2016; LENS Website 06/2014
CESM1-CAM5-BGC Medium ensemble 15xRCP8.5 (2006-2080), branching from corresponding large ensemble runs on January 1st 2006. Updated with 5 additional ensemble members in 12/2014 08/2014
CESM1-CAM5 b.e10.B20TRC5CN.f09_g16.[003,005] 20C (1850-2005) Transient   10/2016
CESM1-CAM5 b.e11.B1850C5CN.f19_g16.008 2° Pre-Industrial Control   10/2016
CESM1-CAM5-BGC Low Warming runs Low Warming runs (Click through for member information) Project information 01/2017
CESM1-CAM5-BGC Pacific Pacemaker Pacific Pacemaker runs (Click through for member information) Project information 01/2017
CESM-WACCM Ivy et al WACCM simulations Fully-coupled WACCM simulations with two different aerosol forcing files 01/2017
CESM-CAM4 Single Forcing runs Single forcing runs 05/2017
CESM_GOGA CESM GOGA simulations CESM GOGA simulations 06/2017